This checklist reflects common practice and is not engineering or commercial advice. Adapt it to your office standards, contract and the applicable design code. Final quantities must be reviewed by a qualified professional.
1. Before you start
- Confirm the drawing set is complete: general notes, plans, sections, details and schedules.
- Confirm every sheet is at the same revision and matches the bid documents.
- Read the general notes for material grades, bolt types, coating and connection design responsibility.
- Read the structural steel specification and note what is classed as miscellaneous metal.
- Confirm units and the drawing standard (imperial and AISC, metric and IS, Eurocode).
- Set up the takeoff template with level, member type, section, mark, count, length, weight and source columns.
- Open a query log for anything unclear.
2. Drawing review
- Walk every framing plan grid by grid and highlight members as you list them.
- Check sections and elevations for braces, hangers and members that do not show in plan.
- Check details for lintels, edge members, kickers and posts called out with "see detail".
- Cross-check plans against the column, beam and brace schedules.
- Note camber, moment connection and composite symbols and confirm what they mean in this office's notation.
- Look for phased or alternate scope: future expansion, add-alternates, demolition.
- Check the architectural set for canopies, screens and support steel not on the structural sheets.
3. Member takeoff
- Every member has a section designation, resolved through the schedule if needed.
- Every member has a mark, or a generated stable number if the drawings do not give one.
- Every line records the sheet and grid where the member was found.
- Column heights come from the column schedule or elevations, not from plan.
- Brace lengths come from elevation geometry, not from the dashed line in plan.
- Repeated bays are checked bay by bay, not copied.
- Illegible or conflicting labels are logged as queries, not guessed.
4. Lengths and weights
- Lengths come from dimensions and grid spacing first, scaling last.
- Any scaled dimension was measured on a drawing calibrated against a known dimension on the same sheet.
- The list states whether lengths are grid-to-grid or fabrication lengths, and does not mix them.
- Weight per unit length comes from the current section tables for the applicable standard.
- Plates and built-up members use volume multiplied by density.
- Units are consistent throughout, and the total states its unit.
- Totals are subtotalled by level and by section so they can be reconciled.
5. Connections and miscellaneous steel
- Base plates, anchor rods and leveling plates are counted from the base plate schedule.
- Connection steel is either taken off from details or covered by a documented percentage allowance.
- The allowance reflects the framing type: moment frames and heavy bracing need more.
- Stiffeners, gussets, bearing plates and embed plates are included.
- Miscellaneous metal (stairs, rails, ladders, grating) is listed separately per the specification.
- Shear studs, deck and bolts are either included or explicitly excluded.
6. Quality checks
- Column count matches the column schedule.
- Infill beam count per bay matches the framing pattern.
- Total weight per unit floor area is within the normal range for the building type.
- No highlighted member on the drawings is missing from the list, and nothing on the list is unhighlighted.
- A second person has walked the drawings against the list.
- All queries are either resolved or carried as stated assumptions in the bid.
7. Handoff
- The takeoff states the revision it was taken from.
- Assumptions, allowances and exclusions are listed on the front page.
- The list can be traced: every quantity points to a sheet and grid.
Why the source column matters. Most of the checks above depend on being able to find where a number came from. That traceability is also the idea behind SteelBox: it finds members on your drawings, shows the source region and evidence for each one, and records every confirmation. See how to do a steel takeoff from drawings for the full method, or request early access.